The extension of the wall at the kitchen's entrance was completed. It was necessary to hide the fridge, else it can be seen from the living room. The finishing looks pretty raw on this side.
The view on the other side of the wall. From this view, one could not tell that the wall has been extended. The workmanship looks pretty gd! The base for the fridge was completed as well.
And so were the base for the kitchen cabinets, the gas piping and the electrical points in the kitchen.
The entrance to the common bedroom 2 has not been sealed up yet.
work in progress ??
The edge to separate the wet and dry area in the master toilet. There will also be a shower screen.
One week has passed but not much has been done. Perhaps both of us were looking forward to the completion of the project! Hope the progress would be much faster in the following week.